January 12-18, 2009Great Weather Allows for Great Progress!
1st Half East Wing Slab Poured (01.16.09)
1st Half East Wing Slab Poured (01.16.09)
ADA Ramp Curing (01.16.09)
Staging Materials for Center Core Deck Framing Next Week (01.16.09)
Preparing East Wing Slab for 2nd Half Pour (01.16.09)
Preparing East Wing Slab for 2nd Half Pour (01.16.09)
West Wing Sonotubes Poured (01.16.09)
Placing Center Core Sonotubes (01.15.09)
Placing Center Core Sonotubes (01.15.09)
Placing Center Core Sonotubes (01.15.09)
West Wing Sonotubes Ready for "Mud" (01.15.09)
Working from the Lift on Sonotube Placement (01.15.09)
Conduit Ready for Electrical Feeds (01.15.09)
Preparing East Wing Slab for Friday's Pour (01.15.09)
Tying Rebar in Staging Area (01.15.09)
Mt. Bachelor in the background. (01.13.09)
Mark of SunWest (left) and Jim Landin of GGL Architecture (right) Inspect Center Core Slab. (01.13.09)
Preparing for East Wing Slab. (01.12.09)
Waterproofing South Wall. (01.13.09)
EZ Flow Drainage System. (01.13.09)
Finishing Center Core Slab. (01.12.09)
Finished Center Core Slab. (01.13.09) |
|